Map fringe costs with fringe mapping rules

Prev Next

Permissions required

To map fringe costs, your account must have one of the following roles enabled:

  • Role: Company Admin

  • Custom role with: Company settings/Accounting settings — Full access

Overview

Fringe mapping rules let you choose where each fringe cost posts in your accounting system: employer taxes, workers' compensation, union fringes, and platform fees. You set the rules once per chart, and Wrapbook applies them every time it pushes payroll.

This article is for Company Admins who manage chart templates. Only Company Admins can view and edit fringe mapping rules.

Before you begin

  • If you use an accounting integration, connect it to Wrapbook

  • Set the chart's Chart category mapping (for example, account, task, or cost code). Fringe mapping rules map to the same kind of value

  • Confirm the project's required dimensions are set up

If your company doesn't have an accounting integration connected, the Fringe mapping rules tab still appears and works the same way. Because there's no integration to pull values from, Map to doesn't show a list of values. Type the value you want in the Map to field instead.

How fringe mapping rules work

Each rule says: for these sections and these fringe cost types, post to this Map to value.

  • Default rule: The row set to All fringes and All sections. It covers every fringe cost that no other rule covers. Every chart needs one, and Wrapbook asks you to add it the first time you save the chart's rules

  • Specific rules: Send selected cost types for selected sections somewhere other than the default

How Wrapbook picks a rule: For each section and cost type, Wrapbook checks in this order and uses the first match:

  1. A specific rule for that section and cost type

  2. A rule that covers the remaining sections

  3. The default rule

If the default rule's Map to is left blank, Wrapbook uses the project's value, then the chart's, then the integration default.

What posts to your accounting system: Wrapbook posts one line for each fringe cost type in each section, such as employer taxes, workers' compensation, union fringes, and platform fees. Each line posts to the Map to value of the rule that covers that section and cost type, and uses the rule's description. A cost type only gets a line in a section when it has an amount there.

Lines are split by cost type, not by account. If two cost types map to the same account, they still post as two lines.

Example: one payroll in a Production section with four fringe cost types posts four fringe lines:

Account

Description

Amount

6100 – Payroll Taxes

Production – Employer Taxes

$200.00

6200 – Union Fringes

Production – Union Fringes

$100.00

6200 – Union Fringes

Production – Workers' Comp

$50.00

6300 – Platform Fees

Production – Platform Fees

$1.00

Fringe lines on the chart: Charts used to map fringes through fringe lines added to the chart, such as Fringe, Employer Fees, and Platform lines. Fringe mapping rules replace those lines. Once a chart has rules, Wrapbook uses the rules to post fringes. If your chart had fringe lines, their mappings were carried over as rules.

Set up fringe mapping rules

  1. In the left-side navigation, under Company, click …More

  2. Click Company settings

  3. Click the Edit button next to Project chart templates

  4. On the Project charts page, click the Edit button next to the chart you want to set up

  5. Click the Fringe mapping rules tab

  6. Find the default rule:

    • The row with Cost Type set to All fringes and Sections set to All sections

    • In Map to, choose where these costs post

  7. To post some fringe costs somewhere else, click the row's ⋮ menu and select Add new line

  8. In the new row, choose the Cost Type and Sections, then choose a Map to value

  9. Optionally, enter a Code and a Description. The description appears on the line that posts to your accounting system

  10. Save your changes

If a rule is missing a required value, Wrapbook highlights it and doesn't save until you fix it.

Edit or remove rules

Edit a rule

On the Fringe mapping rules tab, change the row's Cost Type, Sections, Map to, Code, or Description, then save your changes.

Remove a rule

Click the row's ⋮ menu, select Remove, then save your changes. The costs it covered fall back to the default rule. A new row you haven't filled in isn't saved; select Remove empty row to clear it

Change the chart's category mapping

Next to Chart category mapping, click Change. If the chart already has rules, Wrapbook asks you to confirm because each rule's Map to value depends on the category mapping. Review every rule's Map to value before you issue payroll.

Rule changes apply to payroll pushed after you save. Payroll that already posted doesn't change. If you re-push a payroll, Wrapbook uses the chart's current rules, not the rules in place when it first posted. Before you re-push a payroll that already posted, review your rules, because its fringes will post to the values your rules set now.

Map to values and dimensions

What you choose in Map to follows the chart's category mapping. If the chart maps categories by account, choose an account. If it maps by task or cost code, choose a task or cost code. Where the list doesn't show the value you need, you can type it in.

Dimensions such as project, location, department, or class come from the project and company settings, not from the rules. Company defaults can be overridden for an individual project. To see which dimensions your accounting system supports, see the setup guide for your integration. If your accounting system requires a field Wrapbook can't pass, ask your administrator whether it can be made optional.

FAQ

Where did my chart's fringe lines go?

Once a chart has fringe mapping rules, the rules replace its fringe lines, so the lines no longer show on the chart. Your fringe settings are on the Fringe mapping rules tab.

Why do I see more fringe lines than before?

Fringes used to post as up to three combined lines per section: Fringes, Employer Taxes, and Platform Fees. Each fringe cost type now posts as its own line, so a transaction can have more lines than before. Your totals don't change, and each cost type posts to the value your rules set.

Can I combine fringe lines into one line?

Not right now. Mapping several cost types to the same account doesn't merge their lines, but the account balance is the same. To see combined totals, run a report by account in your accounting system.

My chart already had fringe mappings. Do I need to set them up again?

No. Your existing mappings were carried over as rules. Review them, and add a default rule if Wrapbook asks for one when you save.

Can I copy rules to another chart?

Not yet. Set up rules on each chart.